No Dig Pool Pipe Repair UV CIPP Equipment Process Repair Sewer Highly Integrated

Brand Name:DAO
Model Number:D919
Minimum Order Quantity:1 unit
Delivery Time:15-25 working days
Payment Terms:T/T
Place of Origin:Jiangsu, China
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Supplier`s last login times: within 3 hours
Product Details Company Profile
Product Details

Highly integrated UV cure equipment used to repair underground sewer by CIPP process

DAO company independently designed and developed the UV cure equipment, which is highly integrated and specifically to repair underground sewer networks by CIPP process.


The municipal pipeline trenchless repair equipment is composed of the mobile control system, transmission cable, UV light holder, HD camera, and auxiliary tools. All are integrated into a chassis.


High-efficiency, Integrated design, High integration!!! And energy-saving, few pollutions, only need a generator power supply and use the quiet generator (customer selection available).


Digital transmission, real-time monitoring of repair status, automatic voltage stabilization.


Embedded industrial computer and keyboard, 15-inch touch screen, which can store high-definition images (1920 * 1080).


LED curing is adopted with a short curing time and high speed.


DAO UV cure system D919 is good for the trenchless repair of underground sewer pipes ranging in diameter from DN200-DN1850mm.


Small light train
Applicable pipe diameterDN200-600
Light sourceUV-LED cold light source, 400W * 6 two lamp strings
Temperature sensorEquipped with two temperature sensors (optical convenience 20:1, measurement accuracy ± 1%)
LegThe lamp legs suitable for DN250, dn400, DN500 and DN600 pipes can be interchanged as needed.
Big light core
Applicable pipe diameterDN600-1600
Light sourceUV-LED cold light source, 960W * 3
Temperature sensorEquipped with two temperature sensors (optical convenience 20:1, measurement accuracy ± 1%)
LegThe lamp leg is controlled to rise and fall freely to the appropriate pipe diameter on the touch screen. It stops automatically after lifting in place. It has the functions of upper and lower limits and limit protection.
Folding designIt is convenient for the construction personnel to quickly place the lamp holder.


China No Dig Pool Pipe Repair UV CIPP Equipment Process Repair Sewer Highly Integrated supplier

No Dig Pool Pipe Repair UV CIPP Equipment Process Repair Sewer Highly Integrated

Inquiry Cart 0