Product Details
DAO Stainless steel quick lock preferred for pipeline CIPP point
repair sewers
After the completion of quick-lock construction, the inner wall of
the pipeline is just like a new pipeline. The normal transmission
of urban sewage is very convenient to install. It can be used in
various diameters, big diameters, and specifications. For normal
installation of different pipe diameters, this material can be
installed in sizes as small as 300mm and as large as 3M. This
material can be installed quickly and is suitable for various
environments.
The material of installation material is 304 stainless steel. This
kind of steel can be protected from acid-base corrosion of sewage
for years inside the sewage pipeline, and the sealing effect is
mainly ternary propylene. This kind of material is also inside the
sewage pipe, which can play a sealing effect.
Moreover, its service life is not acid-base corrosion of sewage,
which interferes with normal and has a long service life.
Function | Blocking underground pipe leaking |
Component | Rubber unit and stainless steel lock |
Diameter range | DN800-DN1600 |
Company Profile
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure
systems with liners and CCTV inspection crawlers for underground
pipelines to service customers all over the world.
The product range covers four series and more than 20 models in the
underground pipeline trenchless repair industry:
1. UV curing and repair integrated system D919: LED lamp curing and
high-voltage mercury lamp curing.
2. UV cure liner: from diameter DN200 up to DN1800
3. Hot water cure liner: impregnated liner to invert by water
gravity and cure by hot water
4. Pipeline inspection robots crawler D18 and D18s: CCTV video
inspection of pipeline defects
5. Pipeline periscope D16S: quickly view the internal defects of
the pipeline
Headquartered in Shanghai, Daoyunai has a number of independent
intellectual property rights and also has a manufacturing base and
R&D and testing center in Suqian City, Jiangsu Province,
covering an area of more than 35000 square meters, which fully
implements the international quality management system.
Focused on producing trenchless CIPP system with liners and
inspection CCTV
Committed to providing solutions for reducing costs and improving
efficiency
