UV Pipe Lining Trenchless Sewer Repair Services Municipal Pipelines Maintenance Assessment

Brand Name:DAO
Minimum Order Quantity:60m
Delivery Time:18 working days
Payment Terms:T/T
Place of Origin:Jiangsu, China
Price:Variable
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Supplier`s last login times: within 3 hours
Product Details Company Profile
Product Details

Material for municipal pipelines maintenance and service and assessment


Key items for UV cured CIPP operation and construction:


Inner layer breakage

The inner layer of the UV curing repair material is a plastic film, which is easy to be damaged due to improper operation during construction

Once it is scraped, the materials in this section are basically discarded, and there are basically no rescue measures. Therefore, protecting the inner membrane of materials during construction is the key and difficult point of construction.


The dragging and curing operation of materials is also very important in construction. Here, the causes of inner membrane damage are summarized to ensure the actual construction

It does not occur during work.


Binding head

To bind the binding head, first check whether the binding head has any damage or burr, whether it is clean, and whether there is any sharp thorn formed after resin curing, in case of any of the above conditions, the burr must be cleaned, the burr must be ground flat, and multi-layer winding film must be wound to protect the binding head from pollution, which also serves to isolate the binding head from the inner membrane of the material, so as to protect the inner membrane from being damaged by sharp burr. In particular, the keel must be wound for several more circles.

Handle the binding head with care. If the binding head hits the inner membrane of the material, it is easy to bump the inner membrane of the material.


When binding the head, more materials must be bound and bound firmly to ensure that the head will not jump out during pressure.


Being jumped out may cause damage to the inner membrane, which is unfavorable for the smooth construction. In serious cases, it may cause construction failure and threaten personal safety. Although it is possible to rebind the head, the secondary binding head is difficult to operate and is not easy to bind firmly. Especially DN800 and above materials.


MaterialFiberglass and resin liner
TechnologyCIPP trenchless technology
LengthAny length is possible

China UV Pipe Lining Trenchless Sewer Repair Services Municipal Pipelines Maintenance Assessment supplier

UV Pipe Lining Trenchless Sewer Repair Services Municipal Pipelines Maintenance Assessment

Inquiry Cart 0