

Add to Cart
Air Driven Double Diaphragm Pump Water Treatment Industry
1.Iding capability,self suction,no comples control.
2.Bolt joint design provides even sealing pressure for optimal
performance.
3.Diversity of material,no rotating parts,applicable to various
erosive situatons.
4.Diaphragm,ball and ball seat adopt imported materials with longer
service life.
5.Modular air valve for stall-free,low pulsation
operation,providing smooth and rapid changeover.
6.The delivery lift and flow can pass the pneumatic valve open to
realize the stepless adiustment.
MAXIMUM LIQUID TEMPERATURE FOR RUBBER PARTS
Buna N | 180°F (82°C) |
Santoprene | 180°F (82°C) |
PTFE | 212°F (100°C) |
Hytrel | 248°F (120°C) |
248°F (120°C) | |
Max Air Consumption | 45scfm(22.5L/s) |
Air Inlet Size | 1/2 in.npt(f) |
Air Outlet Size | 3/4 in.npt(f) |
Fluid Inlet Size | 1 in. |
Fluid Outlet Size | 1 in. |
Net Weight | Aluminum 8.2kg |
Air Driven Double Diaphragm Pump Application
Mud Treatment "Water" is by means of physical, chemical,
biological, and removal of a number of production, Life of harmful
substances do not need to process. Diaphragm pump also play an
important role in environmental protection ,mud treatment industry
protecting the diaphragm pump in the waste water treatment industry
transport all kinds of waste water ,lime syrup,soft sediments,
sewage and chemical waste water.
FAQ
Q1. Can I have a sample order for air diaphragm pump?
A: Yes, we welcome sample order to test and check quality. Mixed
samples are acceptable.
Q2. What about the lead time?
A: 3-5 days for Sample preparing ,8-10 working days for mass
production.
Q3. Do you have any MOQ limit for air diaphragm order?
A: Low MOQ, 1pc for sample checking is available.
Q4. How do you ship the goods and how long does it take to arrive?
A: Ship by DHL, UPS, FedEx or TNT. It takes 3-5 days to arrive.
Airline and sea shipping also optional.
Q5. How to proceed an order for air diaphragm pump?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our
suggestions.
Thirdly customer confirms the samples and places deposit for formal
order.
Fourthly We arrange the production.