

Add to Cart
Electric Grouting Machine
Air Chamber and pressure gauge of Electric Grouting Machine:
Electric grouting machine BPX/250 type is provided with an air
chamber, which can buffer and stabilize the slurry pressure. The
air chamber is connected with the slurry pipe and the pressure
gauge. The pump uses kBY-LA seismic pressure gauge, with a range of
0-16mpa, and the table has good resistance to pressure and
vibration, durable and beautiful in shape. The pulp outlet is
connected with the gas chamber pulp outlet flange by double-head
bolts, and the inner diameter of the pulp outlet is 32 mm.
Technical parameters of Electric Grouting Machine:
Cylinder number | 3 |
Bore diameter | 80mm |
Piston stroke | 100mm |
Diameter of suction pipe | 64mm |
Diameter of outlet pipe | 32mm |
Motor power | 15kw |
Main shaft speed | 1440 r/min |
Working pressure | 6 Mpa |
Structure of Electric Grouting Machine:
Electric grouting machine is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.
The installation foundation of cement grouting pump should be
smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent
the vibration of the pump during operation.
Preparations before pumping of Electric Grouting Machine:
After the pump has been stopped or reinstalled for a long time, the
following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission
mechanism.
5. Check the looseness of fasteners, especially the screw
tightening of rubber piston locking nut, cross head and piston rod
connection thread.
6. Check the suction height of the pump. The maximum suction height
of the pump should not exceed 2.5 meters in areas below 1000 meters
above sea level. In areas above 1000 meters above sea level, the
suction height of the pump should be reduced according to the local
atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank.
Generally, the mud level should be below 0.3-0.5 meters, and the
filter should be no less than 0.5 meters away from the bottom of
the mud tank.