Construction 15Kw Mobile Concrete Pump For Fine Aggregate

Brand Name:Tytion
Certification:CE, SGS,BV
Model Number:GS120
Minimum Order Quantity:1 set
Delivery Time:3-5 working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: MEIJI ROAD NO. 18, ZHONGYUAN DISTRICT, ZHENGZHOU CITY, HENAN PROVINCE, CHINA
Supplier`s last login times: within 12 hours
Product Details Company Profile
Product Details

Secondary structure pump large power Concrete Pump Mobile fine aggregate concrete


Concrete Pump Mobile


Requirements for Concrete of Concrete Pump Mobile:
1. The concrete in pumping should usually use ready-mixed concrete, and a mixing station can also be set up on site to supply pumping concrete. Hand-mixed concrete cannot be pumped. At the same time in the pumping of concrete supply should be strictly controlled, pay attention to the change of slump at any time, do not meet the pumping requirements of concrete is not allowed to pump, in order to ensure the effective work of concrete pump.
2. The sand ratio of concrete should be 38% ~ 45%.
3. Concrete mix ratio shall meet the requirements of pumpability in addition to the requirements of concrete design strength and durability.


Parameter of Concrete Pump Mobile:

ModelGS120-1GS120-2
Number of cylinder22
Material cylinder diameter120mm120mm
Air cooler modelAH1012T-CA (AC380)AH1012T-CA (AC380)
Type of Gear PumpGJ2050/LGJ2050/L
Rated pressure of gear pump20 MPa20 MPa
Maximum outlet pressure3 MPa3 MPa
Theoretical discharge7-9 m³/h7-9 m³/h
Pump lift20m30m
Distance of farthest conveying40m60m
Maximum material diameter20mm20mm
Tank volume78 Liter78 Liter
Dimension size1895×726×1300 mm1895×726×1300 mm
Weight700kg730kg

Working process of Concrete Pump Mobile:

First of all, the concrete pump must be parked on flat, solid ground, absolutely not on soft ground, in order to avoid the inclination in the process of work.

Start the main motor for a short time operation, and observe whether the pressure gauge is normal. According to the length of the pipeline, before starting the construction work, we must first pump the water into the pipeline through the pendulum valve to lubricate the pipe wall. Then mortar, and finally concrete, work begins, and often run the test pump empty, with clear water pumping to confirm the smooth pipeline.


Pictures of Concrete Pump Mobile:


China Construction 15Kw Mobile Concrete Pump For Fine Aggregate supplier

Construction 15Kw Mobile Concrete Pump For Fine Aggregate

Inquiry Cart 0