Reliable Horizontal Hydro Electric Turbine 250kw Extended Lifetime

Brand Name:Wawushan
Model Number:SF-010
Minimum Order Quantity:1
Delivery Time:180 wordking days
Payment Terms:T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Address: Anxi village, Yuping town,Hongya county, China
Supplier`s last login times: within 20 hours
Product Details Company Profile
Product Details

250kw Hydro Electric Turbine For Micro Hydro Power Plant


Overview


All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to

improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is

provided precisely where it is needed: in the core.

A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator

configuration, we offer state-of-the-art cooling systems.


Specification


Name250kw water turbine generator
Capacity2250KW
Frequency50HZ
Generator Voltage400V
Layout patternhorizontal
Material(coil)copper
ExcitationBrushless
Generator InsulationF/F
Lifespan50 years

our service package as follows


1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant (Optional)
c. Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(



China Reliable Horizontal Hydro Electric Turbine 250kw Extended Lifetime supplier

Reliable Horizontal Hydro Electric Turbine 250kw Extended Lifetime

Inquiry Cart 0