

Add to Cart
250kw Hydro Electric Turbine For Micro Hydro Power Plant
Overview
All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to
improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is
provided precisely where it is needed: in the core.
A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator
configuration, we offer state-of-the-art cooling systems.
Specification
Name | 250kw water turbine generator |
Capacity2 | 250KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | horizontal |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
our service package as follows
1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler,
condensing water collector, deaerator, high pressure and low
pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment
provided by Runh Power
b. Installation, testing & trail run of all systems of a power
plant (Optional)
c. Installation, testing & trail run of entire power plant
(Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(