2500kwmini Hydro Generator For Micro Hydro Power Plant


overview


Hydro-generating unit is the key power equipment in the hydropower plant.

The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro-turbine runner. two different mount for generator of vertical and horizontal which could be operated at brushless excitation and thyristor excitation. the hydro generator has usually used air as medium to cool its stator, rotor winding and iron core.


Specification


Name2500kw Hydropower Electricity Turbine Generator
Capacity22500KW
Frequency50HZ
Generator Voltage6300V
Layout patternvertical
Material(coil)copper
ExcitationBrushless
Generator InsulationF/F
Lifespan50 years

our service package for hydro power plant


1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant (Optional)
c. Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(