

Add to Cart
550kw Turgo Wheel Turbine For Micro Hydro Generator
overview
We can supply hydraulic turbines system , hydro turbine system such
as kaplan turbine, propeller turbine, francis turbine and pelton
turbine, turgo turbine and so on, also with speed governor,
generator, valves, excitation system and its other accessories.
In order to guarantee the product quality,the company has advanced
testing instruments and strictly defers to ISO9001 quality
management system.It is strictly controlled the quality in every
process to assure the high level,fineness and no bug of products.
Regardless of size, all turbines are manufactured with only
high-quality components, and undergo rigid quality inspections to
ensure high efficiency and reliable operation.
Deflector speed control giving a fast response to load / frequency changes
Modular design approach
Flexibility in turbine design, layout and configuration
No penstock surge in response to a change in load or frequency
No penstock surge on emergency shutdown on loss of grid
Operation possible down to 10% of rated flow
A higher annual energy may be possible than is available from reaction turbines
on projects with long periods of low flow
Specification
Name | 550kw Turgo Wheel Turbine |
Water Head | 103.0m |
Runner Diameters | 0.64 m |
Capacity2 | 550KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
Advantages
Covers the boundary between Francis and Pelton
Limits Over-Pressure Effect over the penstock
Higher speed = weight and cost reduction
Maintains efficiency over a wide flow range
Superior abrasion resistance
Ease of operation and maintenance
1. The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler,
condensing water collector, deaerator, high pressure and low
pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment
provided by Runh Power
b.Installation, testing & trail run of all systems of a power
plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.