Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine Permanent Magnet Impulse Generator

Brand Name:Wawushan
Certification:ISO9001
Model Number:XJ-003
Minimum Order Quantity:1
Delivery Time:120 wordking days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Address: Anxi village, Yuping town,Hongya county, China
Supplier`s last login times: within 20 hours
Product Details Company Profile
Product Details

1000kw turgo hydro turbine For Hydro Generator


overview


Turgo turbine is one of impulse turbine, applicable water head 30 to 300 meter. The center of jet flow with runner gyration plane angled 22.5°. the water flow contracted by the spray nozzle , flows entering one side of runner and comes out from other side.
Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.
The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.

Specification


Name1000kw Turgo Water Turbine Generator
Water Head98.0m
Runner Diameters0.75 m
Capacity21000KW
Frequency50HZ
Generator Voltage400V
Layout patternvertical
Material(blades)Stainless Steel ZG0Cr13Ni4Mo
ExcitationBrushless
Generator InsulationF/F
Lifespan50 years

Advantages


Covers the boundary between Francis and Pelton


Limits Over-Pressure Effect over the penstock


Higher speed = weight and cost reduction


Maintains efficiency over a wide flow range


Superior abrasion resistance


Ease of operation and maintenance


The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.



China Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine Permanent Magnet Impulse Generator supplier

Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine Permanent Magnet Impulse Generator

Inquiry Cart 0