

Add to Cart
1000kw turgo hydro turbine For Hydro Generator
overview
Turgo turbine is one of impulse turbine, applicable water head 30
to 300 meter. The center of jet flow with runner gyration plane
angled 22.5°. the water flow contracted by the spray nozzle , flows
entering one side of runner and comes out from other side.
Horizontal unit has the advantages of simple structure,convenient
repair,reduce the plant height,advantages in reducing excavation
depth.
The vertical unit with plant plane size small,a runner can be
provided with a plurality of nozzles,(at most can be installed six
nozzles),high specific speed,the same size as units of capacity is
relatively small,light weight and so on.
Specification
Name | 1000kw Turgo Water Turbine Generator |
Water Head | 98.0m |
Runner Diameters | 0.75 m |
Capacity2 | 1000KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
Advantages
Covers the boundary between Francis and Pelton
Limits Over-Pressure Effect over the penstock
Higher speed = weight and cost reduction
Maintains efficiency over a wide flow range
Superior abrasion resistance
Ease of operation and maintenance
The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing
water collector, deaerator, high pressure and low pressure
superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment
provided by Runh Power
b.Installation, testing & trail run of all systems of a power
plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.