50HZ Turgo Impulse Turbine Generator 600kw Turgo Water Turbine

Brand Name:Wawushan
Model Number:XJ-013
Minimum Order Quantity:1
Delivery Time:120 wordking days
Payment Terms:T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Address: Anxi village, Yuping town,Hongya county, China
Supplier`s last login times: within 20 hours
Product Details Company Profile
Product Details

600kw Turgo Water Turbine Generator For Hydro Power Plant


overview


Turgo turbine is one of impulse turbine, applicable water head 30 to 300 meter. The center of jet flow with runner gyration plane angled 22.5°. the water flow contracted by the spray nozzle , flows entering one side of runner and comes out from other side. The structure is simple and easily inspected and maintained.

Specification


Name600kw Turgo Micro Wheel Hydro Generator
Water Head108.0m
Runner Diameters0.72 m
Capacity2400KW
Frequency50HZ
Generator Voltage400V
Layout patternvertical
Material(blades)Stainless Steel ZG0Cr13Ni4Mo
ExcitationBrushless
Generator InsulationF/F
Lifespan50 years

Advantages


Covers the boundary between Francis and Pelton


Limits Over-Pressure Effect over the penstock


Higher speed = weight and cost reduction


Maintains efficiency over a wide flow range


Superior abrasion resistance


Ease of operation and maintenance


our service:

1. The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.


China 50HZ Turgo Impulse Turbine Generator 600kw Turgo Water Turbine supplier

50HZ Turgo Impulse Turbine Generator 600kw Turgo Water Turbine

Inquiry Cart 0