

Add to Cart
SINO YSV 1160 Cnc Milling Machine 3 Axis Provided High Precision Metal Machining Heavy Duty
Excellent Performance Machine Center
1. Taiwan's frequency converter tool magazine has accelerated processing by 1.4 seconds by cutting the time it takes to switch tools;
2. All three axes frequently generate high torque, enabling quick
and accurate positioning.
3. The spindle motor is powered by a conventional 11–15 KW
high-torque generic motor. This spindle torque is ideal for heavy
cutting because it is significantly higher than that of comparable
models.
.
The conditions in which machines function
1. A 380V, three-phase power supply with a 50Hz, 10%, 15%, and 1Hz
alternating current frequency.
2. The outside temperature is 840°C.
3. An 80% relative humidity
4. A supply pressure for air between 0.6 and 0.8 MPA
Product image /photos:
The process of installing, commissioning, accepting, and training
1. Installation and commissioning: As soon as the machine tool is
delivered, our service engineer will go to the customer's location
to finish installation and commissioning as well as on-site
training.
2. Customers may send operators to our company for an initial training session that lasts for about a week; after that, our firm will offer on-site instruction at the customer's location for installation and commissioning.
3. Acceptance: Accuracy acceptance examines both the inspection items that can be examined at the customer's location and those that do not meet the inspection requirements, such as positioning accuracy, spindle taper hole accuracy inspection stick test, etc. It does this by using the ex-factory accuracy inspection table that the supplier has provided.
For inspection and acceptance, the buyer will dispatch workers to the supplier's factory.
After-sales service concept
1. Pre-sales service: Janssen's sales representatives will present
clients with the finest processing alternatives, including tool and
fixture selection, option configuration, and machine tool
selection.
administration of lubricating oil, cutting fluids, and other
services. offering turnkey projects in addition.
2. Maintenance response time: We have a service crew of up to 26
people and a fully working service van at our disposal. As soon as
we receive the user's failure notification, we will respond within
two hours.
3. Parts inventory: Janssen has a specialized production facility and a full stock of parts in Xiamen. Each office maintains stockpiles of frequently used parts to provide users with the fastest repair components.