Add to Cart
Bore Size 7 1/16" Oilfield Drilling Blowout Preventer Equipment Double Type Ram BOP
I. Blowout Preventer Equipment Product model: 2FZ18-35
II.Blowout Preventer Equipment Main uses
The hydraulic double-ram blowout preventer is designed to
effectively control blowouts during oil (gas) testing. It is also
used for workover and data measurement at low-pressure wellheads.
The hydraulic double-ram blowout preventer can be used alone or in
combination with a single-ram blowout preventer. It can also be
used in conjunction with an annular blowout preventer.
III. Blowout Preventer Equipment Working principle
1. Switch action principle
When the high-pressure oil of the hydraulic control system enters
the closing chamber of the left and right hydraulic cylinders, the
piston is pushed to drive the ram shaft and the ram assembly to
move toward the center of the wellhead respectively along the
tracks defined by the ram chamber to seal the well. When
high-pressure oil enters the opening chamber of the left and right
hydraulic cylinders, the piston is pushed to drive the ram shaft
and ram assembly to move away from the center of the wellhead to
open the wellhead. The gate switch controls the opening and closing
actions of the blowout preventer by the reversing valve of the
hydraulic control system.
2. Sealing principle:
The ram blowout preventer must have four seals to effectively seal
the wellhead, namely: the ram top seal and the shell seal. The
front seal of the gate, the seal between the pipe and the front
seal. Seal between housing and side door. The seal between the gate
shaft and the side door.
The sealing process of the gate is divided into two steps: first,
under the action of hydraulic oil, the gate shaft pushes the front
sealing rubber core of the gate to squeeze and deform the sealing
front part, and finally the interference compression sealing part
between the sealing rubber core and the shell. This creates an
initial seal. Second, when there is pressure at the wellhead, the
well pressure pushes the front seal of the ram from the rear of the
ram to further squeeze and deform. At the same time, the well
pressure pushes the ram from the bottom to float close to the upper
sealing surface of the shell, thus forming a reliable seal, which
is called a well. Pressure assists sealing effect.
The specific tasks are:
1. When there is pipe in the well, it can close the annular space
between the casing and the tubing. It can be equipped with 2 3/8?,
2 7/8?, 3 1/2? and full sealing gate, which can close the annular
space. Pipes with the above specifications are also available with
cable gates. (Specific specifications are configured according to
customer requirements)
2. When there is no drilling tool in the well, the well can be
sealed with a full sealing gate.
3. In order to effectively control the formation pressure, it can
be used in conjunction with the oil (gas) test manifold to achieve
pressure balancing operations.
4. Special operations such as well killing and well cleaning can be
carried out while the wellhead is closed.
IV. Main technical parameters of BOP
Name: Hydraulic Double Ram Blowout Preventer
Model: 2FZ18-35
Rated working pressure: 35Mpa
Nominal diameter: 180mm (7 1/16)
Strength test pressure: 52.5 MPa
Ram specifications: The upper cavity is equipped with 2 7/8?, the
lower cavity is equipped with fully enclosed gate
**Bottom connection: 350 flange
Bottom connection: 350 flange