

Add to Cart
Features of Explosion Proof Led High Bay:
Specifications of Explosion Proof Led High Bay:
Power | 10W/20W/30W/40W/50W/100W |
Color Temperature(CCT) | 3000K/4000K/6500K |
Lamp Luminous Efficiency(lm/w) | 140lm/W |
Color Rendering Index(Ra) | 80-83Ra |
Waterproof | IP65 IP66 IP67 |
Support Dimmer | Triac dimmable or 0-10V dimmable |
LED chip | SMD2835, Epistar, Samsung, Osram |
Material | Aluminum+PC |
Lifespan (hours) | 50000 |
PF | 0.95 |
Input Voltage(V) | 85-265V OR 12V DC, 24V DC |
LED driver | Isolated and flicker free |
Pictures of Explosion Proof Led High Bay:
1. Safety: By offering safe illumination options in dangerous settings, explosion-proof LED bulbs help to reduce workplace accidents.
2. Economical: Over time, LED lighting' longevity and energy
efficiency result in considerable cost savings.
3. Less of an influence on the environment: LED lights use less
energy and produce less trash because of their extended lifespan.
4. Versatility: Explosion-proof LED lights are very adaptable and
suitable for usage in a range of dangerous conditions.
Application of Explosion Proof Led High Bay:
1. Oil and gas: Refineries, petrochemical factories, and offshore oil rigs all employ explosion-proof LED lighting.
2. Mining: By using LED lights, the danger of explosions is
decreased in underground mines.
3. Chemical and pharmaceutical: LED lights are used in settings
where there is a possibility of combustible vapors and gasses.
4. Manufacturing: Industries like food processing facilities and
paper mills, where dust and other particles are abundant, employ
explosion-proof LED bulbs.
5. Transportation: The train, aviation, and marine sectors all
employ LED lighting.
FAQs:
1. Can I have a led light sample order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
2. How long will it take?
A: Sample needs 2-4 working days, mass production time needs 12-18 working days
3. How are the goods shipped, and how long does it take for them to
arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5
days to arrive. Airline and sea shipping also optional.
4. What is your main product line is made?
A: We mainly produce led application classes and industrial lighting fixtures. Including daily life indoor lighting and outdoor lighting. (led high bay light, led flood light, led street light, led module light and solar led light, more)