4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power

Brand Name:ISUZU
Model Number:4JG1
Delivery Time:5 - 8 work days
Payment Terms:D/P, T/T
Place of Origin:Japan
Price:Negotiated
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou China
Supplier`s last login times: within 47 hours
Product Details Company Profile
Product Details

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75 - 8 Water Cooling


Specification


Car name: Complete Engine
Model Number: 4TNV98
Cylinder stroke: 107
Application: Excavator
Cylinder diameter: 95. 4
valve: 8 valve
Cooling: Water cooling
Output: 48.5kw
Injection: Direction
Cylinders of number: 4


Description

What is an engine assembly?
A cylinder block assembly and head assembly are described for use in an internal-combustion engine. They include: a closed-deck, cylinder block with a deck and first fluid chamber; and a cylinderhead disposed on the deck having a second fluid compartment; and a gasket interposed between the cylinder blocks and the cylinder heads.


How long does it take for a motor to be installed?
The shop time for a typical engine will be between 10 and 12 hours. A simple engine with a skilled mechanic may be quoted in as little as 8 to 12 hours. Larger jobs may take up to 15 hours.


How can I find out if I have an engine bloc?
A cracked engine block can be characterized by overheating, blue or gray smoke coming from the underside of the hood, and poor performance. Most often, the problem is caused by excessive heat due to low coolant, extreme temperature, or overburdening. You risk bursting a head gasket if you don’t resolve the problem quickly.


How long does it take for an engine to be installed in a car?
A typical engine will take between 10 and 12 hours to repair. A simple engine with a skilled mechanic may be quoted in as little as 8 to 12 hours. Larger jobs may take up to 15 hours. The majority of quotes should be given within the first hour.


How long does it take for a car engine to be put back together again?
Two weeks


How long does it take to put together an engine?
On average, we are 30 to 45 days behind. It takes 35 to 40 to build an engine (by the time parts get in, machining gets completed, all hand fittings, etc.).You can expect to be waiting between 70 and 90 days from start-to-finish.


China 4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power supplier

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power

Inquiry Cart 0