

Add to Cart
High Efficiency H Beam Flange Web Plate Automatic Assembling Welding Machine
Product Description
Web height: 160-1500/1800/2000mm
Web thickness: 3-40
Flange width: 160-800mm
Flange thickness: 6-40mm
Workpiece length: 4000-20000mm
Assembly spped: 0.5-6 m/min
Electrical assembly: the brand is AC converter
Total power: 10KW
Power supply: AC 380V 50HZ 3phsaes
Assembling machine:(Structure Principle)
Host machine:Including Main drive roller bearing power components,
the door frame device, clamping device of web, wing powder compact
device, hydraulic alignment device, etc.
Main drive roller moving roller components:The motor drives the
cycloidal pinwheel reducer, and then through the sprocket, chain
transmission, drive the main drive roller rotation (attached drive
roller 2 group), making walking hbeam.
Web clamping device:Two groups of web plate fastening device for
synchronous movement, through the coupling and the shaft connection
between two groups.Total power of the motor drive gear reducer, and
then through a screw transmission so that the web clamp sliding
seat together to walk in the middle.Web clamping mechanism of two
side by clamping bolt tightening on the sliding seat directly,
through the shaft linkage with open or shrink, to meet the
requirements of the web the clamping, realized the machine
automatically.
Wing clamp device:Two sets of wings clamp lock mechanism for
synchronous movement, through the coupling and the shaft connection
between two groups.Total power of the motor drive gear reducer, and
then through a screw transmission so that the web clamp sliding
seat together to walk in the middle.Wing clamp on two sides of the
clamping seat directly to tighten bolts on the sliding seat through
the shaft linkage with open or shrink, to meet the requirements of
wing plate clamp, realized the machine automatically.
The door frame press device:Can lift the main pressure beam mainly
include:Pressure cylinder, lift drag plate, eccentric adjustment
wheel, pinch roller.Hydraulic alignment equipment,hbeam not spot
welding, flange and web will produce uneven phenomenon, then we can
align the wing, to web hbeam equipment parts, makes the plate close
to the base plate, so that the transverse alignment.Alignment
device can make mechanical flip up and down.
(2)the pull rodof the system:On the bar system mainly includes:Pull
rod box, rod oil cylinder, pull rod.When not set of wing, web
transmission into the machine, the wings, not in the required
position precision, web and web need support at this time.Rod for
the system is able to wing, web preliminary positioning and its
process are respectively, by the surface tension in the oil
cylinder and the web of the tensioning oil cylinder control.Pull
rod box by pull rod connected between each other.
(3)Input roller:Input of raceway is mainly with the input process
of hbeam, it consists of, passive and active raceway groove, the
arrangement and the spacing between rolling suitcase.
(4)Output roller:Output of raceway is mainly with the output
process of hbeam, it consists of, passive and active raceway groove
(5)Hydraulic system assembly:Hydraulic system mainly
includes:Hydraulic pump station, the main pressure cylinder, wing
plate positioning cylinder, web positioning cylinder, wing powder
tight oil cylinder (3pcs), web clamping cylinder (2pcs), rubber
hose, oil pipe, seamless steel pipe.
Due to the limitation of the website, I can only offer you a pic
and a littel detailed information, so if you are interested in the
products , or want more detailed information or have some problems,
please contact me freely.I will try to solve it for you as soon as
possible.
Z15 H beam assembly machine
Structure Principle
This machine is mainly composed of the following parts:
1. the main engine assembly, |
2. pull rod on the system, |
3. the input roller, |
4. output roller, |
5. hydraulic system assembly, |
6. electric control system. |
the main drive roller (2 groups), |
the web clamp system (2 groups), |
the wing plate clamping system (3 groups), |
lifting the main compression beam, |
H type steel alignment part. |
a)the main drive roller
b) web clamping system
c) wing plate clamping system
d) main lifting compaction beam
e) H steel partially aligned
Rod on the system (two groups)
Input and output rollers
Hydraulic system assembly
Suitable workpiece`s size:
Web height | 200-1500mm |
Web thickness | 6-40mm |
Flange width | 160-800mm |
Flange thickness | 6-40mm |
Workpiece length | 4000-15000mm |
Assembly spped | 0.5-6 m/min |
Electrical assembly: | the brand is AC converter |
Total power | 10KW |
Power supply | AC 380V 50HZ 3phsaes customized |
Scope of supply and composition
-the main engine assembly, web clamp, flange plate clamping, etc..
B.input and output roller assembly:
-roller of 2.6m/ * 6 festival festival, rod system etc.
C.hydraulic system:
-pump station, oil motor, high pressure hose, hydraulic cylinder,
etc..
D. automatic spot welding system:
-350A CO2 welding power source*2pcs.welding, mechanical tracking mechanism, the hydraulic cylinder
clamping mechanism etc. (manual welding without the equipment,
automatic welding).
E.electric control system:
-electric cabinet, AC inverter, etc..
F.spare parts:
-O button 3. The HH54PDC24V relay 2. The molten core 4A, each 3 6A.
Technical documents
Instructions for the use of the complete machine (including the
electrical principle diagram, hydraulic principle diagram, wearing
parts list, etc.)
Frequency converter using manual, hydraulic pump station manual
Delivery list
Equipment qualification certificate
Basic graph
Production and self owned part
A. Foundation (provided by the supplier).
B. anchor bolts and expansion bolt.
C. machine foundation.
FAQ:
Q1: I knew nothing about this machine, how am i know this machine
will meet my working needs?
Please tell us your workpiece size or show specific drawings, we
will give you professional solutions.
Q2: When I got this machine, but I don't know how to use it. What
should I do?
We provide overseas service and English manual, after installation,
if any problems happen, we offer the remote video guidance and
charging overseas service.
Q3: If some problems happen to this machine during warranty period,
what should I do?
Contact us directly, we will supply free parts during machine
warranty period. While we also supply free life long after-sales
service.
Q4: If i want visit your factory, how can i get?
Company address:39#, Liandong U business park, Wuxi city, Jiangsu,
China
Factory address:Xinhong Industrial Park, Dongtai Yancheng City,
Jiangsu, China
1) Visa: if u need get a government visa, pls pay 20%(at least)
prepayment for new customer. Wuxi government regulations. Thanks
for support.
2) By train: Wuxi station. By air: Wuxi Shuofang Airport. We will
drive u to our factory. 180km between Wuxi and Yancheng city.
Q5: Why your sales office at Wuxi, but your factory located at
Yancheng?
10 years ago. In response to the Yancheng government investment
invitation, our leader moved the factory from Wuxi to Yancheng,
purchased 15,000 square meters of land and built factories. In
order to reduce production costs and sustainable development.