

Add to Cart
These kinds of parts entail the precise mold and high-accuracy injection machine to produce the satisfactory parts in the vacuum clean room specified level of 100,000. It is commonly difficult that the readily find unfilled components in the same cycle, so the injection and cavity balance should be emphasized as an important point at the design stage. The mature experience gives us more successful cases and provides us the valuable guide idea for our future projects.
Parameter
Brand Name | Gennki Group |
Description | Plastic Injection Mould |
Material | Steel |
Plastic Material | PP,PC,PE,PA6,ABS,PET,PVC,POM,.etc |
Gate system | Cold Runner/Hot Runner |
Ejection | Pin/Stripper Plate. Air pocket |
Movement | Slider/lifter |
A.B plate | 1.1730/P20.etc |
Tool Life | 1M shots (Prototype tooling 2000pcs) |
Mold Base | Copy DME or Hasco steel |
Cavity&Core | P20/H13/NAK80/S50C/S136/738H.etc |
Surface Finish | Polish/Texture/Heat Treatment.etc |
Cavities | Single/Multiple/Family mold Lead Time: 3~8 weeks |
Place of Origin | China EAST |
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test
requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process.
Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine
number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the
management team once any key chain is a delay.
4) If a delay happens on delivery in the course, extra hours will
help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in
terms of your 2D sketch, or certain samples.
Q5. Can we test the plastic injection mold?
You are always welcome to the company with us to try the molds in
place in person. The testing video can be supplied for your
checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between
100,00 to 1 million (or sometimes somewhat more than a million)
cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the
warranty period. Gennki’s strategic associated American mold shop
will assist you to handle the modification change if needed after
the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at
PVG Airport or Hongqiao Airport from your workplace. The nearby
high-speed train station to Hongqiao Airport will facilitate your
trip to elsewhere in China.