

Add to Cart
And for now, copper parts had been widely used in electric, light industry, machinery manufacturing, construction industry, chemical industry, defense industry and other fields. Of course, the different industries to the surface finishing of copper parts requirement is difference.
What you will expect from Gennki is as following, when ordering:
All the parts from Gennki, not exist sharp edge. Holes and screw holes are naturally chamfered for convenient assembly.
The craftsmanship of all parts we machined is controlled
rigorously, Every product has been machined following its destined
processing procedure.
Every well-experienced staff double-check the program, drawing, and
SOP and tools before action;
The operator has to run FA for quality approval before mass production;
The operator has to check every measure once one setup is done to
avoid parts scrap in the end.
All staff has been successively in the course of training for
quality control and continuous improvement.
Every product will be carefully packed to prevent bump and rust in transit.
Material | Aluminum Alloy: |
5052 /6061/ 6063 /6082/ 2017 / 7075 / etc. | |
Brass Alloy: | |
3602 / 2604 / H59 / H62 / etc. | |
Stainless Steel Alloy: | |
303 / 304 / 316 / 412 / etc. | |
Steel Alloy: | |
Carbon Steel / Die Steel / Spring Steel etc. | |
Other Special Materials: | |
Wide Range for Your Selection. | |
Surface Treatment | Blacking,polishing,anodize,chrome plating,zinc plating,nickel plating,tinting |
According to customers' specific requests. Match Your Products. | |
Usage | Medical equipment, electronic equipment, communication equipment, semiconductor equipment, mechanical equipment, automation |
equipment, new energy, petroleum, automobile, aviation, motorcycle, bicycle, etc | |
Sample Time and Bulk Time | Sample Time Around 3-7Working Days; High Vloume/ Time Around 8-30Working Days. |
MOQ | 1pcs, Low MOQ to Avoid Unnecessary Waste of Your Products and Money. |
Payment Term | T/T |
Shipping | By Air or Sea. If Choose by Air, it is Faster Like You Purchase
from Local Market. |
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test
requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process.
Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine
number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the
management team once any key chain is a delayed.
4) If a delay happens on delivery in the course, extra hours will
help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in
terms of your 2D sketch, or certain samples.
Q5. Can we site-visit to experiment with the finished component?
You are always welcome to the company with us to try the molds in
place in person. The testing video can be supplied for your
checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between
100,00 to 1 million (or sometimes somewhat more than a million)
cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the
warranty period. Gennki’s strategic associated American mold shop
will assist you to handle the modification change if needed after
the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at
PVG Airport or Hongqiao Airport from your workplace. The nearby
high-speed train station to Hongqiao Airport will facilitate your
trip to elsewhere in China.