

Add to Cart
Voltage rating: 500/690V
Current rating: up to 1250A
Temperature range:-5°C to +40°C
Height above sea level:≤2000m
Humidity: no exceed 50% while temperature is +40°C no exceed 90% while month average temperature no exceed 25 °C
Min breaking current: up to 120KA
Protecting against short-circuit: type aR
Protecting against motor short-circuit: type aM
Standard: IEC60269, EN60269
Class of pollution: third class
Installatin: Ⅲ
Type | Rated Voltage(V) | Rated Current(A) | Grading Current | PCS/CTN | G.W(KG) | N.W(KG) | MEAS(CM) | ||
FUSE LINK | NT00C(NHOOC) | 500-660V | 4A-100A | gG / gL / aR/aM | 180 | 26 | 25 | 35*25*22.5 | |
NT00(NH00) | 500-660V | 10A-160A | gG / gL / aR/aM | 100 | 22 | 21 | 43*17*23 | ||
NT0(NH0) | 500-660V | 6A-160A | gG / gL / aR/aM | 72 | 20 | 19 | 37*37*23 | ||
NT1(NH1) | 500-660V | 32A-250A | gG / gL / aR/aM | 48 | 23 | 22 | 43*28.5*22 | ||
NT2(NH2) | 500-660V | 80A-400A | gG / gL / aR/aM | 36 | 27 | 26 | 38*31.5*23.5 | ||
NT3(NH3) | 500-660V | 160A-630A | gG / gL / aR/aM | 24 | 22 | 21 | 44.5*32*20.5 | ||
NT4(NH4) | 500-660V | 500A-1250A | gG / gL / aR/aM | ||||||
FUSE HAND | 50 | 18 | 17 | 36.5*34*50.5 | |||||
FUSE BASE | NT00C(NH00C) | 500-660V | 160A | gG / gL / aR/aM | 108 | 28 | 27 | 38*30.5*29 | |
NT00(NH00) | 500-660V | 160A | gG / gL / aR/aM | 108 | 28 | 27 | 38*30.5*29 | ||
NT0(NH0) | 500-660V | 160A | gG / gL / aR/aM | 72 | 30 | 29 | 41*36*25 | ||
NT1(NH1) | 500-660V | 250A | gG / gL / aR/aM | 30 | 24 | 23 | 41*33.5*29 | ||
NT2(NH2) | 500-660V | 400A | gG / gL / aR/aM | 20 | 24 | 23 | 46*33*22 | ||
NT3(NH3) | 500-660V | 630A | gG / gL / aR/aM | 20 | 26 | 25 | 46*26*34 | ||
NT4(NH4) | 500-660V | 1250A | gG / gL / aR/aM |
HHouse Service CU
T OUT FUSE 1
1 Where is your factory?
Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.
2 Are you manufacturer or business?
We are manufacturer established in 2002, and have over 16 years production experience.
3. Can I ask for samples?
Yes
4. What's the warranty of your products?
18 months
5. What's the lead time?
Depend on the quantity and model of the order, normally it takes around 2-3 days, but the
exact lead time should be discussed with our sales.
6. How about the MOQ, Payment term, Delivery port, and shipping date?
1)MOQ: 100 pcs/item based on existing packing.
2)T/T-30% deposit and 70% against copy of BL
3)L/C is also acceptable
4)Ningbo/Shanghai