Custom P20 Plastic Injection Molding Parts Die Makers Universal Air
Conditioner Remote Control Shell
Mold Material | S136/2344/718/738/NAK80/P20, etc. |
Plastic Material | ABS, PP, PC, PVC, POM, TPU, PC, PEEK,HDPE,NYLON, Silicone, Rubber,
etc |
Mold Base | LKM, HASCO, etc. |
Sureface Treatment | Polishing/smooth,texture/frosted, painting, plating, printing ,
etc. |
File Format | STEP, STP, STL, X-T, IGS, PDF,JPG,etc. |
Quality Assurance | ISO9001: 2015, SGS, ROHS, TUV, CE etc |
Our Equipments | High speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder,
Plastic Injection Molding Machine from 30-1400T available. |
Main Field | Home appliance, Medical device, Electronic device, Automotive
parts, Tele-communication, Lighting control equipment, digital
device, Robots, etc. |
Packaging & Delivery
- Packaging Details
- -Carton box with appropriate paperboard thickness
-Inside care with bubble wrap or protective foam
-Double inside care with cushioning materials
-Strong tape wrapped ouside
-Other special requirements from client
- Port
- Guangzhou, China
- Lead Time:
Quantity(pieces) | 1 - 10 | 11 - 100 | >100 |
Est. Time(days) | 30 | 60 | To be negotiated |
WHY CHOOSE US?
1. One Stop Service
We can offer part design, model building, rapid prototype testing
and injection molding mass production services.A range of surface
finishing, post-processing and assembly are also workable. Can
bring you a convenient and efficient experience.
2. Non Disclosure Agreement
We can sign NDA with you and keep secret to your idea and design.
3. Professional Engineering Team
We have a professional engineering team, half of whom have more
than 15 years of experience in the mold industry, especially
tooling, pleastic molding products, CNC machining and 3D printing.
4. Fast Delivery Time
We have advanced technology processing machines and time-mobilized
staffs, so can finish prototype project within 3-5 days, prototype
mold within 15 days, and 3-5 weeks to make mass production complex
mold.
5. Quality Control Expert
We have passed ISO9001 Quality Management System Certification,
having onsite materials, toolings and parts inspection before
production and delivery.
6. Experienced Business Development Team
We have 15 business development specialists with good English
capabilities and communication skills to know your need timely.
FAQ
Q1. Are you a factory or trade company?
We are a factory located in 6th Building, No 51, Nanhuan Ave,
Gongming, Shenzhen, 518106, China.
Welcome to visit our factory.
Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, plastic
injection, assembly, and surface treatment.
Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks
Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is
approved.
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba's trade assurance.
Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.